Yagi Construction
Home
Up

 

This page contains links to the construction of the CN2R yagis.  The pages are organized by subject categories. The available categories are listed below. Clicking on the photo or the hyperlink brings you to the listed subject photos and drawings

YAGI CONSTRUCTION 10/15/20

The first phase of yagi construction was in Jun 2002

YAGI CONSTRUCTION 40

The three 40M yagis are all short yagis.

YAGI CONSTRUCTION 80

The 2 el 80 meter yagi project was started in April 2003.

ROTATING DIPOLE CONSTRUCTION 160

The 1 el 160 meter rotating dipole was built and installed at the same time as the 80 meter yagi project.

 

Home | Up | Links | Feedback

This page was last updated 08/31/06