|
Construction of the Radio Shack was completed in Sept 2002.This was my first view of the shack.
|
|
CN2R shack October 2002. First contest with a SO2R-- ACOM 1000 an Yaesu ft1000MP
|
|
Left table operating position Mar 2003. Antenna control allowed 2 driven antennas per band.
|
|
This photo shows the empty operating table. All radios and amplifiers are stored off-site after the contest.
|
|
October 2003 shack. Added LCD monitors, Emtron amplifier and the third tower.
|
|
November 2003 left operating position. Added more antennas and ACOM 2000
|
|
Mar 2006 Left position. dual monitor, Better low-band RX antennas. three transmit antennas per band.
|
|
Side LCD Monitor, on 2nd computer, used to monitor power and record contest audio
|
|
Mar 2008 Left position. Dual monitor with articulating arms.
|
|
Trophy for CN2R CQWW SSB SOAB 2004 High power Winner!
|
|
Main Left operating position with Bigali paddles and full-travel small keyboard.
|
|
Oct 2004 antenna control muxed a Cushcraft A3s between 10/15/20. This allowed 3 direction TX/RX.
|
|
Oct 2003 antenna control added a stackmatch for each of the 6 bands. The RAS8 control and K9AY control are also shown
|
|
Prositel rotors and ICE 419 bandpass filters driven by Top Ten sync/source band decoders
|
|
160M/80M antenna control. The 3 switches allow operation from 1.800 - 1.900 Mhz on 160M rotating dipole
|
|
ACOM2000 amplifier (4cx800)
|