Tower setions arrived on site. They are wrapped to prevent paint loss. |
 |
This tower was erected with a 220V My-Te rope capstan winch. |
 |
The tower bracket for the winch. The cleat is used to tie down the rope |
 |
All tower section were pre-fitted on the ground. |
 |
Each of the 3 meter sections was numbered when the 6 bolt holes were
drilled. |
 |
The first 3 sections are up. Time for the first set of Philystran guy cable. |
 |
12 sections up, 3 more to go. The Philystran cable has to be attached every
15 meters. |
 |
The top section's 2 thrust bearings and rotor plate are aligned on the
ground. |
 |
2 inch OD 4 meter long pipes used for the cable messenger supports. |
 |
The crew stringing the coax and rotor cable to the messenger. |
 |
160 dipole, 80 meter yagi and 20 meter yagi. For more photos see the South
Tower collection. |
|
|